– Completed plastering.
– Completed bricklaying.
– Poured concrete floor slabs for lower ground floor.
– Poured concrete floor slabs for the underground parking.
– Cast columns for the ground floor.
Attached below are progress photos taken 24/08/2025:

Exterior photos of 1-6 misonettes


Interior photos of 1-6 misonettes.

7-9 misonettes, ground floor